FULLY EQUIPPED STEEL FABRICATION FACILITY TO HANDLE ALL TYPES OF HEAVY, MEDIUM AND LIGHT STEEL STRUCTURES. SPECIALISED EQUIPMENTS INCLUDE MULTIHEAD PROFILE BURNERS, HEAVY DUTY MIG WELDING MACHINES ETC., AVERAGE TURN OVER CAPACITY WITH THE PRESENT STAFF IS APPROX. 1000 TONS/MONTH AND CAN BE EASILY INCREASED TO 1500 TONS/MONTH, IN ADDITION TO OUR VARIOUS OTHER ACTIVITIES.

HIGH QUALITY PRODUCTION PERFORMANCE, CAREFUL PLANNING AND QUALITY CONTROL PROCEDURES ENSURE PRECISION MANUFACTURED END PRODUCTS. THESE ENSURE PROMPT DELIVERIES AND ON-TIME ERECTION TO THE SATISFACTION OF CLIENTS.

 

LIST OF MAJOR PROJECTS CARRIED OUT FOR GAS SECTOR

1

CHIYODA TECHNIP JV

QATAR GAS 3 & 4 ONSHORE PROJECT (TRAIN 6 & 7)
QCSYD2101G – LARGE BORE FITTINGS – MITER BENDS

2

CHIYODA TECHNIP JV

RAS GAS ONSHORE EXPANSION PROJECT PHASE 2 ( TRAIN 6 & 7)
RG6L5P2085 – LARGE BORE FITTINGS

3

CHIYODA TECHNIP JV

RAS GAS ONSHORE EXPANSION PROJECT PHASE 2 ( TRAIN 6 & 7)
RG6K4B0151 – FABRICATED STEEL STRUCTURE.

4

C. C. I. C.

SEA WATER INTAKE PIPE 3 M DIA FOR ADGAS THIRD LNG TRAIN PROJECT.

5

C. C. I. C.

INTAKE RISER HEAD. - ADGAS THIRD LNG TRAIN PROJECT.

6

C. C. I. C.

PIPE SUPPORTS FOR VARIOUS PROCESS PIPE LINE. ADGAS THIRD LNG TRAIN PROJECT.

7

BELLELI

PLATFORM AND SUPPORTING STRUCTURE  JEBEL ALI ‘E’ STATION.

8

BELLELI

CuNi PIPE FABRICATION - JEBEL ALI ‘G’ STATION.

9

BELLELI

STORAGE TANK FOR DUGAS.

10

BELLELI

SECONDARY STEEL WORK FOR DUGAS MTBE TANKS

11

BELLELI

52” DIA STEAM EXTRACTION PIP LINE FOR AL TAWEELAH.

12

BELLELI, QATAR

QAFCO III EXPANSION ROLLING PLATES FOR AMMONIA STORAGE TANK T-1301

13

ABB COMBUSTION

FABRICATION AND SUPPLY OF OUTLET GAS DUCTS TO HRSG BOILERS COMPLETE WITH STAIRS, PLATFORMS AND ACCESSORIES INCLUDING PROTECTIVE TREATMENT FOR JEBEL ALI ‘E’ STATION PHASE III.

14

ABB COMBUSTION

FABRICATION AND SUPPLY OF 2 NOS STACKS 30 M HIGH FRO HRSG BOILER COMPLETE WITH LADDER PLATFORM AND ALL OTHER ACCESSORIES.

15

ABB COMBUSTION

JORDAN NATIONAL ELECTRIC CO, - AQABA THERMAL POWER STATION – AIR, GAS DUCTS & STRUCTURAL STEEL WORK.

16

MITSUBISHI CONSORTIUM

FABRICATION OF INLET DUCTS FOR DUBAI ELECTRICITY & WATER AUTHORITY, AL AWEER POWER STATION.

17

MITSUBISHI HEAVY INDS. LTD., JAPAN

RAS LAFFAN LNG TANKS – SHOP FABRICATION

18

JGC KELLOGG, JAPAN

RAS LAFFAN ONSHORE FACILITIES PROJECT – STACKS, DUCTS AND STEEL WORK

19

TECHNIPETROL

EMIRATES NATIONAL OIL CO. (ENOC) – STACKS.

20

CCT Srl, ITALY

MINISTRY OF ELECTRICITY & WATER – TANKS & STACKS

21

BESIX

ENRON – DHABOL PROJECT OFFSHORE WALKWAYS

22

BERMACO ENERGY

DESALINATION PLANTS AT RAS AL KHAIMA, FUJAIRAH & AJMAN - TANKS & STACKS

23

CCT

SEWA –DESALINATION PLANT.
BOILER STACK DUCTING, MODULE CASING, DEAERATOR TANK AND BLOWDOWN TANK SECONDARY STEELWORK

24

AL HABTOOR ENGINEERING

STEAM TURNINE BUILDING - FUJAIRAH WATER & POWER PROJECT

25

JOHN ZINK COMPANY LLC

RAS LAFFAN LNG EXPANSION PROJECT - LIQUID INCINERATOR STACK

26

NOOTER ERIKSEN –CCT

SHUWEIHAT CMS INTL. POWER COMPANY - INLET DUCT.

27

C.M.I

KESTREL PROJECT – FABRICATION OF DUCTING, CASING, CHIMNEY AND EXDPANSION JOINTS.

28

C.C.T.

HEAT RECOVERY BOILER – 3 UNITS FOR FEWA AJMAN &
RAS AL KHAIMAH PLANTS – U.A.E.

29

ARABIAN DRILLING CO.

RIG REPAIR JOBS.

30

MITSUBISHI HEAVY INDS. LTD., JAPAN

RAS LAFFAN ONSHORE EXPANSION PROJECT - LNG TANK

31

CHIYODA TECHNIP J.V

RAS GAS EXPANSION PROJECT - QATAR - MITER BENDS

32

CHIYODA TECHNIP J.V

RAS GAS EXPANSION PROJECT – PLATFORMS STRUCTURAL STEELWORK

 
 
 